Article Guide: Using two in situ retrofit cases from Lijiang and Chengdu wastewater plants as entry points, this article reveals the industry trend shifting from large scale demolition and construction to in situ capacity tapping for upgrade and expansion. Three driving forces are pushing aging wastewater plants toward in situ retrofit: influent concentration returning to design values, tightening discharge standards with quasi Class IV rollout, and performance based payment policies taking effect. Small and medium sized plants face four key bottlenecks: lack of calculation tools, chaotic media market, complex retrofit processes, and insufficient technical support. Tongxiang Small Boss has transformed from a media supplier into a wastewater treatment bioengineering service provider, offering one stop service across four pillars: solutions, process design, media, and technical support.
The First Wastewater Treatment Plant in Lijiang, Yunnan recently achieved something remarkable: without adding a single inch of process land, it converted its original CASS tanks to a pure biofilm process, expanding daily treatment capacity from 30000 to 50000 tons, while upgrading effluent standards from Class I-A to quasi Class IV. A 100000 ton scale plant in Chengdu went even further, using MBBR combined process for in situ upgrade, achieving a power consumption of only 0.32 kWh per ton of water after retrofit.
These two projects point to the same signal: in an era of land exhaustion and budget tightening, the optimal solution for wastewater plant upgrade and expansion has shifted from "large scale demolition and construction" to "in situ capacity tapping".

Why now? Three forces have converged.
Upgrade, expand, and do it without new land, three goals must be achieved simultaneously. Adding suspended bio media into existing tanks to multiply the total microbial mass, the biofilm process has therefore become the common choice for major projects. It can be predicted that in the coming years, a large number of aging wastewater plants built a decade ago across the country will successively embark on this path of "in situ retrofit".
However, the same path presents completely different levels of difficulty for large projects versus small plants. Behind the Lijiang project were top-tier design institutes, leading engineering companies, and expert teams. The reality across the country is that there are far more small and medium sized wastewater plants, rural sewage stations, and enterprise-built wastewater stations, and when they face upgrade pressure, what holds them back is not money, but these four issues:
| No. | Key Bottlenecks for Small and Medium Plants |
|---|---|
| 1 | Not knowing whether their tanks can still be optimized, lacking a reliable calculation method |
| 2 | The bio media market is chaotic, with no one providing biofilm formation guidance after purchase, and many seeing no results after three months |
| 3 | Retrofit is not just about buying media, dosing ratio, aeration intensity, retention screens, and hydraulic distribution are all interlinked, one mistake leads to a cascade of errors |
| 4 | The biggest fear is that when effluent fluctuates, there is no one who can help diagnose the problem |
Simply put, what small and medium clients lack is not a truckload of media, but a partner who can manage everything from solution design to commissioning.
Tongxiang Small Boss Special Plastic Products Co., Ltd. has been manufacturing bio media for over two decades, and its identity has long evolved beyond just a media supplier to become a wastewater treatment bioengineering service provider, offering solutions, process design, technical support, and media, managing everything from one end to the other:
| Service Pillar | Details |
|---|---|
| Solutions | The company's independently developed biofilter calculator takes water quality, flow rate, and target indicators as inputs, estimating media requirements and tank compatibility within minutes, allowing sales staff to provide preliminary solutions to clients on site |
| Process | From media selection, dosing ratio, tank layout to aeration design, each project is customized one-to-one based on project water quality, with no template copying |
| Media | Produced at their own source factory, with material and batch stability fully under their control |
| Technology | Biofilm formation guidance, commissioning support, and problem diagnosis throughout the entire process, media leaving the factory is not the end of service, but the beginning |
![]() | ![]() |
![]() | ![]() |
In the era of performance-based payment, what clients want is never just a truckload of media, but a biological tank that consistently meets discharge standards. On the path of upgrade and expansion, every wastewater plant needs a reliable partner.
What Small Boss is doing is enabling small and medium clients to access complete service from solution design to commissioning. This is exactly what Small Boss is working to achieve.
Related Reading
MBC Mixed Filler Retrofit Solution for Wastewater Plant Upgrade
MBBR Process Design and Commissioning for Municipal Wastewater Plant Upgrades
How to Select the Right MBBR Media for Wastewater Treatment Projects
Small Boss MBBR Bio Media on Made-in-China
Small Boss MBBR Bio Media on Alibaba International Station
Small Boss Bio Media B2B Site (xlbmbbr.com)
About Tongxiang Small Boss Special Plastic Products Co., Ltd.
Tongxiang Small Boss Special Plastic Products Co., Ltd. was founded in 1992 and is located in the Tongxiang Economic Development Zone, Zhejiang Province. It is a National High-Tech Enterprise and a National Specialized "Little Giant" Enterprise. The company is the drafting unit of the HG/T 5924-2021 industry standard for "Biofilm Carrier for Wastewater Treatment". Its core product, the patented S-type MBBR bio media, has been successfully deployed in over 320 environmental water treatment projects. The company maintains long-term industry-academia collaboration with Zhejiang University, Hohai University, Xi'an Jiaotong University, and Hubei University of Technology, providing one-stop service from solution design to commissioning and operation for municipal wastewater, industrial effluent, rural sewage, and recirculating aquaculture. Learn More
Need Technical Support for Wastewater Plant In Situ Retrofit?
Share your water quality, flow rate, and target indicators with us, and the Small Boss technical team will evaluate your retrofit feasibility
Contact: Marc Ding +86 15868365820
431 Tongsheng Road, Tongxiang Economic Development Zone, Zhejiang, China